BP Workshop Kwinana
The new RV workshop at Kwinana Refinery have been designed to meet new operational requirements of BP.
The new RV workshop at Kwinana Refinery have been designed to meet new operational requirements of BP.
Datum101 we engaged to provide the services design for the construction of the new office block within two new workshop buildings for Schlumberger.