2H Offshore
| Sector(s): | › Commercial, Fit-out |
| Location: | › Level 8, 1008 Hay Street, Perth WA |
| Services: | › Electrical, Mechanical, Fire and Hydraulics |
| Completion: | › November 2014 |
Description: Construction of 1008 Hay Street was completed in 2013 and the 500m2 fitout for 2H Offshore was the first on the top floor of the building. The design included reception, boardroom, meeting rooms, comms room, open plan workstations, and a staff hub / breakout area. The programme was fast paced and Datum101 worked closely with the Interior Designers and Fitout Contractor to ensure the project deadlines were met. |
|